IPS 60

K-12 - IPS #60 Project

IPS #60 was a continuation of DVPE’s conversion of Indianapolis Public Schools to 2-pipe. School 60 was built in the late ‘60s as an all electric building, hence no boiler room. After several failed attemts by others to come up with a cost effective solution, DVPE designed and built system that did not add to the building foot print or detract from academic spaces. An accelerated schedule had us beginning construction in late May and opening for kids in mid-August.