Clowes Hall

Higher Education - Clowes Hall Project

Clowes Hall renovations replaced original (50 year old) HVAC equipment and air handlers. It converted the building from from steam to low temperature hot water and added a heat recovery chiller for summer humidity control. The heating and cooling plant were sized to accommodate the adjacent Schrott Center, saving significant construction dollars at Schrott. DVPE’s approach deleted the Schrott boiler room, saving 1200 square feet of new construction, a $200,000 savings.


MBE, DBE, and 8(a) Certified Firm
INDOT Pre-Qualified
www.dvpe.net